During the Great Eastern Highway reconstruction some of the water mains pipes were replaced or repaired. These works were carried out at night to cause minimal disruption to business and residential areas. Dons Water Supply was contracted for the supply of scheme water to these premises whilst the mains were shut down. This entailed disconnecting the meters