Past Projects
No job too large or unusual.
Our network of support agreements with other water carriers in surrounding areas means we can rapidly expand the number of tanker trucks to meet the needs of any sized project. We work only with carriers that meet our own high standards and training.
As part of our ongoing quality control we have put in place a Quality Management System, Safety Management Plans and Procedures & an Environmental Policy. [These documents are reviewed annually and available in PDF format upon request via email.]Don’s Water Supply has been awarded a certificate for Health, Safety and Environment by the Water Corporation in recognition of achieving their Contractor Pre qualification standards.
Great Eastern Highway (emergency water supply)
September 2012
During the Great Eastern Highway reconstruction some of the water mains pipes were replaced or repaired. These works were carried out at night to cause minimal disruption to businesses and residential areas. Dons Water Supply was contracted for the supply of scheme water to these premises whilst the mains were shut down. This entailed disconnecting the meters, connecting our fill pipes to the premises and keeping a supply pressure maintained until disconnection was required.
Two Rocks (town site - overnight supply)
November 2013
Dons Water Supply was approached by PRA Water Corporation to supply the whole town site of Two Rocks with its own water supply over night while the town water tanks were removed from service for upgrades. Our answer was “We can do it”!We are contracted to the Water Corporation and PRA and have access to the Incident Management Team and their equipment during any emergency shut-down or burst main situation. During the Two Rocks Town Supply we used 9 scheme water supply trucks all registered with the Water Corporation, two Euro Containers, pumping units and Gen Sets enabling us to achieve our outcome.The project had to be pre-approved by the Water Corporation Health Management Team and HSE Management with ongoing co-ordination during the project itself.